1 | BURAK ALTAY | ODAŞ ELEKTRİK ÜRETİM SANAYİ TİCARET A.Ş. | ODAŞ ELEKTRİK ÜRETİM SANAYİ TİCARET A.Ş. | 03.03.2014 08:29:22 | |
2 | ABDULKADİR BAHATTİN ÖZAL | ODAŞ ELEKTRİK ÜRETİM SANAYİ TİCARET A.Ş. | ODAŞ ELEKTRİK ÜRETİM SANAYİ TİCARET A.Ş. | 03.03.2014 08:36:18 |
Ortaklığın Adresi | : | Fatih Sultan Mehmet Mahallesi Poligon Cad. Buyaka2 Sitesi No:8B 2.Kule Kat:17 Tepeüstü - Ümraniye - İSTANBUL |
Telefon ve Faks Numarası | : | 0216 474 14 74 - 0216 474 04 74 |
E-posta adresi | : | info@odasenerji.com / yatirimciiliskileri@odasenerji.com |
Ortaklığın Yatırımcı/Pay Sahipleri İle İlişkiler Biriminin Telefon ve Faks Numarası | : | 0216 474 14 74 - 0216 474 04 74 |
Orjinal Açıklamanın Tarihi | : | 10.09.2013 |
Yapılan Açıklama Ertelenmiş Bir Açıklama mı? | : | Hayır |
Özet Bilgi | : | Çan Kömür Rezervi Hakkında |
10.09.2013 tarihinde yapmış olduğumuz açıklamada, Çanakkale ili Çan ilçesinde bedeli ödenmiş rödovans hakkı bulunan Çan Kömür ve İnşaat A.Ş.'nin ("Çan Kömür") %92'sini satın aldığımızı duyurmuştuk. Söz konusu sahada Alman menşeili bağımsız maden değerleme şirketi Fichtner tarafından yapılan uluslararası Joint Ore Reserves Committee ("JORC") standartlarına uygun çalışmalar kısmi ölçüde sonuçlanmıştır. Ruhsat sahasının belirli bir kısmında yapılan çalışmalarda, 18,94 milyon ton ispatlanmış, 5,76 milyon ton ilave olması gereken olmak üzere toplam 24,70 milyon ton kömür rezervi tespit edilmiştir. Buna ilave olarak kömür damarının sahanın kuzey-kuzeydoğu yönünde devam ettiği gözlenmiş olup, yapılacak ilave çalışmalar neticesinde tespit edilen rezervin artması muhtemeldir. İspatlanmış rezervin ortalama kalorisi 3.385 kcal/kg'dir. Olması gereken rezervle beraber ortalama kalori 3.481 kcal/kg olmaktadır. Rezerv, yerli linyite dayalı termik santral işleten enerji şirketleri arasında en yüksek kalorili kömür rezervi olma özelliğini taşımaktadır. Bu durum santral yatırımı yapılması durumunda MW başına yatırım maliyetlerini düşürmekle beraber MWh başına üretim maliyetinde de emsallerine göre avantaj sağlamaktadır. Aynı zamanda sahadaki kömür, kalori değerinin yüksek olması nedeniyle doğrudan piyasaya satılabilir durumdadır. Dolayısıyla, kömürün perakende olarak ve/veya üretim aşamasında kömür kullanan sanayi şirketlerine satışı gerçekleştirilerek nakde dönüştürülebilmektedir. Mevcut rezervin en kısa sürede ve en yüksek getiri oranıyla Şirketimize katma değer yaratmasına yönelik çalışmaların son derece hızlı şekilde yürütüldüğü kamuoyuna duyurulur. STATUTORY CORPORATE DISCLOSURE PERTAINING TO COAL RESERVE in ÇAN As pre-notified in our public disclosure dated September 10, 2013, we had acquired 92% equity shares of Çan Kömür ve İnşaat A.Ş. (hereinafter "Çan Kömür"), located in the district of Çan in the province of Çanakkale - possessing paid-up royalty rights for mine-pit operation. The exploration and drilling works at the mentioned field have been partially completed, in compliance with the international "Joint Ore Reserves Committee" ("JORC") standards, structured by the independent German-origin mine valuation company, Fichtner. Based on the reserve survey and detection works conducted on a specific part of the licensed area, 18.94 million tons of measured and 5.76 million tons of additional indicated reserves - totaling a coal reserve deposit of 24.70 million tons - have been discovered so far. In addition to the referred quantity, the coal seam has been observed to continue through to the north-northeast flank of the scanned area, implying that the estimations on the final reserve and deposits located at the site could be elevated upon termination of further and escalated prospecting. The average calorific value of the measured reserve is 3,385 kcal/kg, and reaches 3,481 kcal/kg through the add-on of the inferred reserve values. The reserve site holds a unique value, standing out primarily for possessing the highest calorie coal basin among energy companies operating on locally-obtained lignite-dependent thermic power plants. Marking an exceptional specification, this aspect of the operations enables the establishment to decrease capital expenditures per MW, in case a power-plant is decided to be eventually built, while also providing a clear advantage in the critical item of "cost of production per MW," compared to its peers. Meanwhile, the lignite resources are in a ready-to-sell status to the market, attributable to its significant calorific value. Accordingly, the lignite resources may be liquidated via supplying to the retail market and/or to the industrial enterprises, reliant exclusively on coal utilization at the production stage. We herewith would like to declare that all pertinent and necessary actions targeting to achieve the highest IRR - and definitely creating the highest value for our Company - within the shortest period of time possible, are taken accordingly and pursued with utmost urgency. |
Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.
|